Thursday, 5 November 2009

problems with the editing

We have encountered a problem with the editing in that the shots we have were filmed at different times of the day, so we have a mix of very light day-time shots, and darker night shots. This is major setback and means that we will have to try and gather the original cast and choose what sort of lighting we want, then get a camera out and work out the times when we can shoot.

No response to “problems with the editing”

Leave a reply

 
© 2009 GROUP 35 - Music Video 2009/10. All Rights Reserved | Powered by Blogger
Design by psdvibe | Bloggerized By LawnyDesignz